Placeholder Installer Co. · Site engineer
Retrofit works, 14 floors, one team
How a small installation crew ran a 14-floor retrofit from one shared project on iPhone and iPad.
5 days → 1 day
Handover time reduced
Avg 2.4
Photos per pin
98%
Pins closed with evidence
"We'd normally lose a day a week chasing paperwork. We're shipping handover packs the same afternoon now."
This is a placeholder case study that shows the section shape. Replace with real customer stories before launch.
The situation
A small crew taking on a 14-floor retrofit with tight access windows.
What changed
- Pinned every device on the plan with Apple Pencil during first-fix.
- Layered containment and as-fitted drawings per floor.
- Built a handover pack per area as work closed out.
The outcome
- Handover dropped from a five-day push to a one-day wrap-up.
- Client received a focused PDF instead of a Dropbox dump.